Fitness Centre Shower Refurbishment
Fitness Centre Shower Refurbishment
Old original shower units in the male and female removed due to water damage and leaks.
Flooring and walls stripped back to a bare shell.
Walls re-plasterboarded and re-plastered, new chipboard flooring installed.
All plumbing feeds and waste pipes replaced.
All walls and floors sealed and prepared for final finishes.
New Altro non slip flooring being installed
Altro flooring throughout the changing areas.
Easy clean wall panelling installed all edges trimmed and sealed
T Bar, Shower mixer units installed
Shower cubicle, stainless steel fixings opaque glass panels and doors fitted.
Completed shower blocks now easy access and easy maintenance. Motion sensors for lighting and extractor fans. fans vented through ducting to the outside.
A modern functional finish
Local Barnstaple fitness centre, short notice refurbishment of Men's and Ladies shower blocks, an opportunity to completely transform from old style tiled step in shower cubicles to wet rooms with easy clean panelling throughout. Project needed to be completed promptly, complicated by being on the first floor, a team effort by tradesmen of MJS Building Maintenance Ltd.