Disabled Friendly Bungalow 

Bungalow converted for access friendly use including reconfiguration of rooms, level access ramps, easy access shower, full electrical rewire and complete redecoration. 
Uplift and removal of the old uneven patio slabs North Devon
Uplift and removal of the old uneven patio slabs  
Preparing ground for new hard standing area to the rear of the bungalow. North Devon
Preparing ground for new hard standing area to the rear of the bungalow 
Installation of new Eco drainage channeling for the new concrete hard standing. North Devon
Installation of new Eco drainage channeling for the new concrete hard standing 
Face pointed border brick along edges. North Devon
Face pointed border brick along edge 
Scaffold erected to enable removal of complete chimney and subsequent repairs to roof. North Devon
Scaffold erected to enable removal of complete chimney and subsequent repairs to roof. 
Removal of existing internal walls and partioning. North Devon
Removal of existing internal walls and partioning.  
Installation of new studwork for new room layout. North Devon
Installation of new studwork for new room layout 
Old doorway bricked up. new door way marked out, Lintel install with brick on edge header. North Devon
Old doorway bricked up. new door way marked out, Lintel install with brick on edge header. 
New studwork lay out for rooms and allowing 1000mm doorway access. North Devon
New studwork lay out for rooms and allowing 1000mm doorway access 
Installation of 1000mm door linings. North Devon
Installation of 1000mm door linings 
Ceilings patched and primed for skimming. North Devon
Ceilings patched and primed for skimming 
Walls and ceilings skimmed mist coats of paint, serving hatch to kitchen installed. North Devon
Walls and ceilings skimmed mist coats of paint, serving hatch to kitchen installed 
Utility room skimmed ready for decoration. North Devon
Utility room skimmed ready for decoration 
Walls and timber work painted, 1000mm door access installed. North Devon
Walls and timber work painted, 1000mm door access installed 
Brick bond tiling using rectangle tiles installed in the new shower area. North Devon
Brick bond tiling using rectangle tiles installed in the new shower area 
Industrial grade flooring installed on latex leveled floors, North Devon
Industrial grade flooring installed on latex leveled floors 
Decorations through out to maximum light. North Devon
Decorations through out to maximum light 
New concrete level hard standing completed to enable access to the garden for wheelchair users. North Devon
New concrete level hard standing completed to enable access to the garden for wheelchair users.  
New uPVC front door widened for easy disabled access along with hand rails and outside lighting. North Devon
New uPVC front door widened for easy disabled access along with hand rails and outside lighting. 
A new uPVC wide rear door in new position to access level outside disabled friendly space. North Devon
A new uPVC wide rear door in new position to access level outside disabled friendly space. 
Brick bond tiling completed followed by installation of vertical electric radiator and suitable ease of use AKW wetroom equipment.. North Devon
Brick bond tiling completed followed by installation of vertical electric radiator and suitable ease of use AKW wetroom equipment. 
Dimplex Quantam 7-day electrical storage heating off peak system installed. North Devon
Dimplex Quantam 7-day electrical storage heating off peak system installed. 
Decorations completed for the new open plan living area., North Devon
Decorations completed for the new open plan living area. 
Works managed and arranged by MJS Building Maintenance Ltd. for local authority project to enable full disabled conversion. works completed on agreed time scale and budget. small variations were also added at clients wishes. 
Scaffold erected to enable removal of complete chimney and subsequent repairs to roof. North Devon
Project undertaken and managed By MJS Building Maintenance Ltd.  
If you are interested to find out more you can contact MJS Building Maintenance by using the contact page  
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings