Detached large Garage with pitched roof
Detached large garage with pitched roof North Devon

Old garage removed, site leveled graded and hardcore layed. External shuttering installed using laser level.

Garage foundation preparation, Visqueen damp proof membrane layed on sand bed. Concrete mesh installed and tied to form full sized sheet.

Garage concrete floor poured and tamp finish

Garage block walls construction, 225mm block pillar construction on main openings and central pillars.

Garage lintel installed for entrance

Garage window and door apertures all face pointed block work.

Garage roof trusses in place, cross braces installed.

Garage roof trusses installed, first gable end build to full hight.

Garage progress over view

Garage roof truss construction completes, window installed.

Garage roof construction finshed with UPVC pvc fascia boards.

Garage roof gable end block work completed.

External walls scratch coated and rendered, roof felt and battened.

Dry Verge being installed on new tiles and battons

Completed dry ridge installed all Dry Verge, compleated on new Marly Modern roof tiles
Have a look at our Garage services for more information

Project undertaken and managed By MJS Building Maintenance Ltd. from demolition to completion of project. Project kept within budget and completed on time, working to a pre agreed schedule.